Guide
The questions that separate the quotes
Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.
Get it looked at
Three questions, and up to three Huntington Beach contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Huntington Beach and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
"What is your licence number, and who holds it?"
Then look it up. You are checking that the licence is current and that the name on it matches the name on the contract you are being asked to sign.
"What happens if the decking is rotten?"
You want a rate, not a reassurance. Some rot is likely on any older roof and the rate is the only thing that keeps that predictable.
"Who is actually doing the work?"
Employees, or subcontractors? Both are fine, but subcontracted crews change who carries the workers compensation cover and who stands behind the workmanship warranty.
"Can I see a job you finished five years ago?"
Recent work shows tidiness. Older work shows competence. Ask for the older one.
"What does your workmanship warranty cover, and for how long?"
Material warranties come from the manufacturer and are conditional on correct installation. The workmanship warranty is the contractor's own promise, and it is worth exactly as much as the company behind it.
"What underlayment, and how are the valleys done?"
This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.
In short
Write the answers down. Two weeks later, when the quotes have blurred together, the notes are what you will actually decide on.
Related questions
Do I need a permit?
Almost certainly, for a full replacement. The contractor should pull it, and the fee should be a visible line on the quote rather than a surprise.
I have solar panels. What happens to them?
Panels have to be detached and reset. Budget for it separately and coordinate the two trades. Never put a new solar array on a roof with under ten years left.
Should I repair or replace?
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.