Huntington Beach, CA
Flat roofs do not shed water. They hold it back.
Flat sections on an otherwise pitched house are where the leaks are. Additions, porch roofs, and the bit over the garage.
Describe the flat roofing job
Three questions, then the address. Up to three Huntington Beach contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Huntington Beach and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a flat roofing job. A contractor who has not raised them has not looked properly.
- How the flat section is flashed into adjoining walls and pitched roofs
- Whether water ponds anywhere after rain
- Whether a coating is being sold as a repair
- Drain, scupper and overflow provision
- Which membrane, and how the seams are joined
Coatings can buy a sound roof several years. Coating a failed roof buys you a wet roof with a fresh top coat on it.
Single-ply membranes — TPO, PVC, EPDM — are heat-welded or taped at the seams. The seams and the terminations are the whole job.
Look at the flashing where the flat section meets a wall. That transition leaks far more often than the field of the membrane does.
Locally
Behind it: the marine layer keeping the north slope damp. The north side of a house here ages years faster than the south side, and almost every roof gets replaced because of it.
About flat roofing here
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Are the contractors licensed and insured?
Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.
How many contractors will contact me?
Up to three. That is a hard cap, not a guideline. Three is enough to compare and few enough that your phone stays usable.
